Integrated design involves collaborative work across world from concept to facility handover. As a single contact point, we coordinate design, engineering, construction, and post-construction support. Partnering with top consultants ensures seamless, cost-effective designs compliant with codes, covering all necessary areas.

Planning, Design, Civil Engineering
Our in-house team of architects and civil engineers collaborate to analyze all data received from clients and integrate inputs from our specialist consultants to develop alternative concepts while maintaining the architectural concept's integrity through detailing and coordination of all drawings and designs.
They are also in charge of making sure that all building and planning regulations are followed.
The procedure entails:
  • The conceptual scheme and master plan.
  • Initial design concepts and associated expenses.
  • Costing, quantity surveying, material requirements, and detailed working drawings.
  • Paperwork for tenders and helping with the shortlisting of bidders Assessment of the bid and suggestions.
  • Ideal for construction-related designs.
  • Verification of supplier's shop drawings.
  • Editing and managing changes.
Our experts and architects create alternative structural layouts and architectural conceptions for projects that take into account the situational demands for aesthetics, technology required to meet functional requirements, and cost-effectiveness of numerous possibilities. The designs are implemented in compliance with all applicable installation and design codes to guarantee the building's total safety and functionality.
The task entails:
  • Conceptual diagrams.
  • Comprehensive blueprints and illustrations.
  • Allowing independent design verification.
  • Approve erection processes and verify fabricator designs.
  • Evaluate alternative cost-saving proposals from contractors, if necessary.
  • Accepting the findings of the material tests.
  • The issuance of stability certifications.
To integrate landscape aspects with building design and site conditions, the landscape designer collaborates closely with our architects. He will formulate ideas taking into account the climate, soil, and water availability. Sustainable and environmentally friendly design solutions will be used.
The procedure entails:
  • The conceptual scheme and master plan.
  • Initial design concepts and associated expenses.
  • Detailed working drawings that include comprehensive costs and requirements.
  • paperwork for tenders and helping with the shortlisting of bidders Assessment of the bid and suggestions.
  • Ideal for illustrations of plants.
Bringing the project from design to completion with accuracy is the responsibility of our civil engineering division. To ensure a well-coordinated building process, our project teams collaborate closely with our design office. Time management and quality control are given first attention, and team members are tasked with keeping an eye on every area and communicating with contractor teams to meet deadlines and quality requirements.
Senior team members ' main duties include overseeing cost control and making sure all contractors fulfill their contractual requirements. A documentation team keeps track of the entire process and creates all of the reports that are sent to management.
Components of the work are:
  • Organizing, arranging, and keeping an eye on every timeline.
  • Quantity surveying along with cost control.
  • Verify the GFC, the shop drawings, and the method statements for every task.
  • Oversee all correspondence related to the project.
  • Coordination of the installation of all services and machinery.
  • Perform and document material and workmanship quality checks.
  • Implement all legally mandated safety measures.
  • Maintain a clean environment and make sure construction trash is disposed of in accordance with environmental rules.

© 2024 MannyArchitects. All rights reserved.

Powered by MNS